An office relocation is the most disruptive thing a business can do to its own operations. Done well, the team walks into a better workspace on Monday morning. Done badly, productivity is lost for weeks and the IT helpdesk is flooded with tickets that should never have existed. The difference is in how the furnishing, IT installation, moving logistics and old-equipment disposal are coordinated.
Twelve weeks before the move
- Confirm lease handover dates at both the old and new offices.
- Engage Project Furnishing for the new-office FF&E plan: desks, chairs, meeting rooms, break-out areas, signage.
- Engage Technical Installations for cabling, Wi-Fi, AV systems, server rooms.
- Engage Logistics & Warehousing for the move plan, including any temporary storage.
- Decide what to retire and engage E-Waste Recycling for old IT, AV and furniture.
- Inform staff and lock the move date. Communicate at least eight weeks in advance.
Six weeks before the move
- New-office fit-out begins: structured cabling, AV systems, Wi-Fi access points, security.
- FF&E manufacturing in progress; delivery to new office staged for two weeks before move-in.
- Inventory of old-office equipment: what moves, what gets disposed, what gets donated.
- Client and supplier communications plan for the new address.
- Test ICT migration plan on a small pilot team if your IT setup is non-trivial.
Two weeks before the move
- New-office FF&E installation complete. AV and IT tested with end-to-end ping tests.
- Staff pack personal items into provided crates.
- Final walk-through with the moving logistics team and any landlord representatives.
- Building services confirm move-in and move-out windows for both buildings.
Move weekend
- Friday evening: IT shutdown at the old office.
- Saturday: full move of workstations, files, server equipment, plants.
- Sunday: IT setup and testing at the new office. Final FF&E touches.
- Monday morning: staff arrive, find their workstation, log in, and start the day.
The Gartner workplace research consistently shows that a planned weekend move limits productivity loss to less than half a day. An unplanned mid-week move can cost two weeks.
Old-office close-out and equipment disposal
- Old office cleared and handed back to the landlord with original-condition photos.
- Old IT equipment retired through certified WEEE recycling with Certificates of Data Destruction for anything that held data.
- Old furniture donated, refurbished or recycled depending on condition.
- One-week on-site support at the new office to handle teething issues.
The disposal step is the one most likely to be skipped under time pressure. Skipping it creates a GDPR risk (data on retired laptops) and a sustainability-reporting gap. Our E-Waste Recycling division handles ITAD with chain-of-custody and disposal certificates that satisfy ISO 27001 and CSRD reporting.
Common office-relocation pitfalls
- FF&E delivered before the IT cabling is finished. Furniture gets in the way of the cabling crew. Sequence cabling first, then furniture.
- Wi-Fi heat-map skipped. Coverage gaps only show up on Monday. Run a proper site survey before AP placement is locked.
- Old equipment forgotten until the landlord inspection. Schedule ITAD pickup the same weekend as the move.
- No client communication plan. Updating Google My Business, signature blocks, signage and invoices is bigger than most teams expect.
One integrated partner for the whole move
World-wide Mobility Group brings Project Furnishing, Logistics & Warehousing, Technical Installations and E-Waste Recycling together under one project manager. Office relocations across the Netherlands, Belgium and Germany run with one team instead of four.
Frequently asked questions
How long does an office relocation actually take?
Twelve to sixteen weeks from planning kick-off to teething-issue close. Smaller offices can compress to eight weeks; large multi-floor moves stretch to twenty.
Do you handle the new-office IT cabling?
Yes. Our Technical Installations division handles structured cabling, patch panels, AP placement, AV, BMS and physical security.
What happens to old IT equipment?
Our E-Waste Recycling division collects it under chain-of-custody, performs certified data destruction on storage media, and recycles or refurbishes the rest under WEEE compliance. You receive a Certificate of Data Destruction and an itemised disposal report.
Can you store furniture between offices if there is a gap?
Yes. Our Logistics & Warehousing division operates climate-controlled storage facilities across NL, BE and DE.
Do you work weekends?
Yes. The bulk of move execution happens Friday evening through Sunday for minimum business disruption.